Spillway opening Monday

Published 12:00 am Saturday, May 7, 2011

A pair of cranes that will be used to remove the needles between bays of the Bonnet Carre Spillway have been put in place in preparation for the flood control structure’s opening Monday. The Army Corps of Engineers could open all 350 bays of the spillway. (Staff photos by Robin Shannon)