LA 20 Bayou Chevreuil Bridge Intermittent Lane Closures, St. James/Lafourche Parish

Published 8:29 am Monday, April 26, 2021

Getting your Trinity Audio player ready...

Construction is underway for State Project H.009481, LA 20 Bayou Chevreuil Bridge. The project is 0.441 miles long and the type of work is clearing and grubbing, removal of bridge, grading, drainage structures, milling asphalt concrete, pavement patching, class II base course, asphalt concrete pavement, precast concrete piles, precast prestressed concrete girder span bridge, and related work at a cost of $11,690,767.39.

The Louisiana Department of Transportation and Development advises motorists that there will be intermittent lane closures on LA 20 near the bridge at Bayou Chevreuil. These closures will be on Wednesday, April 28, 2021. The intermittent lane closure will take place between 8:00 am and 3:00 pm. Motorists will still have access to travel the roadway, but should anticipate delays as flaggers facilitate and direct traffic. These closures are needed to allow construction crews to perform pothole repairs on and near bridge.

No permit or oversize loads greater than 10’ feet wide will be able to pass.

DOTD appreciates your patience and reminds you to please drive with caution through the construction site and be on the lookout for work crews and their equipment.